Advertisement
Markets · 16:05 UTC
  • BTC $64,183 −0.4%
  • ETH $1,787 −1.8%
  • BNB $587.77 +0.2%
  • XRP $0.9616 +0.9%
  • SOL $72.56 +2.6%
  • TRX $0.3081 +0.9%
  • FIGR_HELOC $1.02 −3.8%
All prices →
Home » Ethereum Postpones Hoodi Glamsterdam Test, No New Date

Ethereum Postpones Hoodi Glamsterdam Test, No New Date

Teal model of connected nodes on a navy workbench beside a magnifying glass.

In brief

  • Ethereum postponed Hoodi’s 26 October Glamsterdam test; no replacement date is set.
  • The planned increase to a 200 million gas limit is also unscheduled.
  • Mainnet ETH holders need no action; Hoodi operators should consult client-specific guidance.

Ethereum developers have postponed the Glamsterdam upgrade on the Hoodi test network to investigate how proposed gas-accounting changes could affect existing smart contracts. The Ethereum Foundation announced the delay on 22 October, withdrawing the activation scheduled for 26 October 2026 at 17:42:48 UTC. No replacement date has been set.

The official postponement notice also removes the scheduled increase in Hoodi’s gas limit to 200 million. Removing these future settings does not reverse the test network’s transaction history.

This is a new development after the earlier Glamsterdam Sepolia schedule announcement. That historical announcement does not provide current Hoodi operating instructions.

Why gas accounting needs another look

The Foundation says developers delayed the test to investigate interactions between EIP-8037 and mainnet contracts. ChainSecurity’s analysis, based on specifications reviewed on 13 October, examines that proposal alongside EIP-8038, which changes state-access costs.

Gas measures the resources needed to execute transactions. ChainSecurity describes how the proposed rules could change the gas available after a contract call fails. A failure handler that previously ran out of gas and reversed could instead finish, potentially recording a permanent failure where an operation could previously be retried.

The risk also runs in the other direction: an existing gas budget may no longer cover an operation after repricing. The analysis does not establish that every contract or gas check is affected.

CoinDesk and Unchained reported the postponement and the same underlying technical concerns. Their reports are not separate confirmations of an exploit. The cited material does not report an observed hack or realized losses.

What changes for users and operators

Mainnet ETH holders do not need to take action because of this Hoodi postponement. It does not cancel the mainnet upgrade, whose activation date remains unconfirmed.

Hoodi node and validator operators should consult the official notice and their own client teams’ revised instructions. Earlier release tables are not proof that a version removes the old activation.

Unlike Base’s activated Cobalt upgrade, this news concerns a test that has not activated on Hoodi. The Foundation says a replacement Hoodi schedule will be announced separately.

Sources: Ethereum Foundation, 22 October; ChainSecurity technical analysis; CoinDesk, 23 October; Unchained, 22 October.

Follow Cryptured on Telegram

New stories as they go live, plus a short crypto market brief every morning.

Advertisement

Market at a glance

  • BTC$64,183 −0.4%
  • ETH$1,787 −1.8%
  • SOL$72.56 +2.6%
  • Fear & Greed12 Extreme Fear
Updated 16:05 UTC, 17 Nov 2026 · Powered by CoinGecko

All prices →

The Cryptured Weekly

The week in crypto in five minutes, every Monday. No spam, unsubscribe anytime.